Page 1 of 1

house work

Posted: Sun Nov 08, 2009 1:41 am
by original_balzer
wore myself out today

Image

Adding a basement bathroom I have to dig this hole out to 36" to install a tank and lift pump/grinder. This stuff is DENSE lots of work with circular saw and a diamond dry cut blade and a 10 lb beater. I could probably ret some tools but trying to keep it as cheap as possible.

Re: house work

Posted: Sun Nov 08, 2009 4:22 am
by tbhager94
thats nothing, when ever i get to it i have to break up most of my basement because of frost heave, 2 areas that are frost heaved are 10'x6' and 8'-5', i think im going to rent a 110v jack hammer and break it up in one very loud day and carry it out over time.

Re: house work

Posted: Sun Nov 08, 2009 6:48 am
by Hotroder383
I feel your pain tbhager94, I have to do the same thing in my basement this spring. Gota say I am gonna rent a jackhammer though, I'm just too lazy to do it by hand LOL.