Let me know if anyone is available to help build Phase I this spring...

5" floor with 6" where the lift will be. 10' foot side walls and the ceiling will be raftered. where the lift will start (with a 8/12 pitch) it will be 15' at the front and gradually higher as you go inward. Not sure i would ever use two lifts??? There is just one me...astroturf wrote:Looks Good. I would add that, You might want to rethink your lift placement in phase two. Give yourself room for two lifts. How thick is your pad going to be in phase two? Jim
Edit: Oh, almost forgot, how tall is your ceiling in phase two?
The plan is a Shower and toilet bath. I have a wood stove that will be installed along with a used central air (propane) and heat 3.5 ton unit. I will have in floor zoned heat for the shop area. This will be a small homemade system. That way the floor is nice and comfortable should you decide to take a nap during a tranny removal.LiftedAWDAstro wrote:Yeah really...what's another $3k for the second lift?![]()
That is gonna be one hell of a nice shop! I like the TV...errr...I mean how-to video watching room. Is that a bathroom in the other corner? What are you doing for heat?
Your killing me Gary!1Gary wrote:Paint booth/body work/sand blast work area??.