I finished drilling the last 20 holes, everything came out perfect. Then I just set the feet on top and slid the bolts in to hold them well enough for me to get up on a ladder and tack weld the rail:



After everything was tacked down I pulled the rail off and finished the welds all the way around the leg. A few of my welds came out like crap because I kept hitting the duty cycle of the welder. When that happens the wire feeds sporadically and the current fades. But I managed. The heat warped the rail a little bit but at least it warped in the direction of the roofs curvature:

Pressing down on the rail a bit flattened it out so I'm not concerned. With the bolts in everything will look just right:

I cranked up the wire feed speed so I could get good penetration and a wide weld. I wanted to spread the new bead from the square tubing across the bead that was there from welding the caps on and then to the strut rail:

All welded up. I still need to chop about a foot off the front end of the rails. Then clean off the zinc oxide poison and get them ready for paint.


The way the spacing worked out I will only be able to use 6 bolts with nylon lock nuts. The other two bolts will have to go into strut nuts that will sit inside the channel. That's fine, I still have 8 bolts securing the rack only now two of them will have to be coated in Locktite to keep them from rattling loose.
6 bolts are unobstructed:

2 bolt locations fall directly above the leg, so these bolts will tighten down into a strut nut that secures within the channel:

That's it! Doesn't look like much but there was a lot of measuring and aligning that went into this weekends results. In the coming days I will be fitting my spacers.